Last week:

I was able to draft the patterns for the backpack. I was also able to figure out how the technology would be installed into the backpack. The fabric that I needed came in the mail.

This week:

I’ll be going into the construction period. I’ll be using all of the materials that I have now to bring the project to life. After construction, I’ll be looking to solve any problems I encounter. Also, to start thinking about getting the app together so I can make the backpack responsive to the phone.

Will need help picking out that technology (ASAP)