Updated Timeline

Week 0 (March 4th – 10th)

  • Discuss Material and potential designDiscuss Material and potential design

Week 1 (March 11th – 17th)

  • Have a specific design and schematics
    • 3D printer casing
    • Strap
  • Order Materials

Week 2 (March 18th – 24th)

  • Fabricate/Construct

Week 3 (March 25th – 31st)

  • Spring Break

Week 4 (April 1st – 7th) <– 

  • Fabrication

Week 5 (April 8th – 14th)

  • Test If Possible

Week 6 (April 15th – 21st)

  • Fix/clean/modify

Week 7 (April 22nd – 28th)

  • Final Fixing
  • Poster
  • Presentation

Current Progress

Squeeze Buckle + Bar Slide + Elastic Strap + Nylon Strap