Project Post 4

Project post 4

 

In the last week my parts got ordered and shipped including muscle wire and a kneading massager. My leg garment also started by drawing a pattern and cutting it out.

 

The problems I’m facing are that the massager is way bigger than thought it was going to be. Also my vibration pods aren’t going to ship for a while so I’ll probably have to do without those.

 

My plan is to figure out how to incorporate the kneading massager since it’s bigger than expected and the vibration pods aren’t going to come in time. Hopefully deconstructing it andputting it into new casing will make it small enough to use in my project