Updated Timeline
Week 0 (March 4th – 10th)
- Discuss Material and potential designDiscuss Material and potential design
Week 1 (March 11th – 17th)
- Have a specific design and schematics
- 3D printer casing
- Strap
- Order Materials
Week 2 (March 18th – 24th)
- Fabricate/Construct
Week 3 (March 25th – 31st)
- Spring Break
Week 4 (April 1st – 7th)
- Fabrication
Week 5 (April 8th – 14th) <–
- Test If Possible
Week 6 (April 15th – 21st)
- Fix/clean/modify
Week 7 (April 22nd – 28th)
- Final Fixing
- Poster
- Presentation
Sensor casing Prototype v.2
Microcontroller Casing prototype
Current:
- I now have a working prototype temperature sensor
- Still working on Ethernet web connection from my MCU. If that is figured out, my software part is complete.
- I have been designing different versions of casings in CAD. As of now, I am printing the v.3 of the sensor casing
- MCU casing is a bit tricky. Because of the batteries, it is bigger than I hope it to be. Looking for different design options.